Reception classbase view transformed

Our Purpose Built School

Check out the video and pictures below to get a feel for Cringleford Prep.

Our purpose-built school will be completed in May 2024. It will provide high-quality educational facilities, supporting our mission to provide an exceptional education for our pupils. Some of the features of the Cringleford Prep site include:

  • Practical lab for science lessons
  • Large performance space with drama studio
  • On-site kitchen
  • Separate, dedicated play area for Early Years
  • External hard and soft surfaced outdoor play areas
  • Large field 
  • Library

The new school will be two storeys with two classrooms for each year group. There will be car parking for staff and visitors, including electric-charging spaces. Its design and layout have been carefully considered to reduce net carbon. The new building will have solar panels, air-source heat pumps, natural ventilation and an all-electric kitchen.